Research & Documents
Background research, not a Walton project file
No Walton County feasibility study, construction plan, budget, or utility agreement exists to post. Background research from utilities and agencies does, and it is linked below. Those sources describe other places and other rules.
Walton County project records
None yet
There is no adopted feasibility study, no construction record, and no utility commitment for an undergrounding project in Walton County. This site will not invent a local report to fill the space.
Florida undergrounding research
Primary sources already cited on this site. Each line is the publisher’s document, not a Walton finding.
- Storm Secure Underground Program — Florida Power & Light. How FPL describes neighborhood laterals, vegetation outages, easements, and its own 2024 comparison of FPL lines.
- 2024 Storm Protection Plan annual status report — Florida Power & Light, filed with the Florida Public Service Commission. Voluntary municipal undergrounding agreements in 2024, separate from the storm-plan program.
- Undergrounding to Reduce Florida Power System Vulnerability to Extreme Weather (June 2024) — U.S. Department of Energy and Lawrence Berkeley National Laboratory. Duke Energy Florida’s targeted program, and the 2005 statewide cost context. Duke does not serve Walton County.
- Staff audit of Duke Energy Florida’s storm protection programs — Florida Public Service Commission. Treats flood hardening of underground equipment as its own program.
- Section 366.96, Florida Statutes — Florida Legislature. Storm protection plans and cost recovery for investor-owned electric utilities.
- Staff analysis of the 2019 storm-protection bill — Florida House of Representatives. How approved undergrounding in a storm plan can be recovered from customers generally.
- Rule 25-6.115 — Florida Administrative Code. Charges when an applicant asks an investor-owned utility to convert existing overhead distribution.
- Rule 25-6.078 — Florida Administrative Code. Underground service in new residential subdivisions, which is a different case from converting an existing road.
- Section 125.01, Florida Statutes — Florida Legislature. County authority to create a municipal service taxing unit or benefit unit.
- 2025 Local Government Financial Information Handbook — Florida Office of Economic and Demographic Research. Describes an MSTU as the tax mechanism and an MSBU as charges or assessments.
- Offices and service area — Choctawhatchee Electric Cooperative. The cooperative’s statement that it serves most of Walton County. Not an undergrounding program.
- Form 8-K, December 18, 2020 — NextEra Energy, filed with the U.S. Securities and Exchange Commission. Gulf Power merged into FPL effective January 1, 2021.
- News release, January 1, 2022 — Florida Power & Light. Northwest Florida service under the unified FPL name.
Other community examples
These are not direct models for Walton County. The longer write-ups are on Examples.
- Town of Palm Beach undergrounding project — Town of Palm Beach. The town’s own site for a phased, town-wide conversion.
- Phase 8 described as the last phase — Town of Palm Beach. A town calendar entry, not a Walton schedule.
- Project note, week of September 28, 2026 — Town of Palm Beach. Drilling, conduit, street restoration, and pole removal still underway.
- January 2018 town update (PDF) — Town of Palm Beach. Opening financing for the initial phases. Not a total project cost.
- Undergrounding programs description — California Public Utilities Commission. What underground facilities include, and why buried faults can take longer to find.
- Electric Rule 20 — California Public Utilities Commission. How cities requested conversions, and how the funding rules were built.
- Decision 21-06-013 (June 3, 2021) — California Public Utilities Commission. Stopped new Rule 20A work-credit allocations.
- Decision 23-06-008 (June 8, 2023) — California Public Utilities Commission. Discontinued Rule 20A going forward.
- News release, May 6, 2025 — CenterPoint Energy. The company’s report of 400 miles undergrounded in Greater Houston.
- Greater Houston Resiliency Initiative summary — CenterPoint Energy. A later company progress summary. Not an audited Walton figure.
- Docket 57579 stipulation and settlement, June 12, 2025 — Public Utility Commission of Texas. The settlement’s description of strategic undergrounding and its cost estimate.
- Open-meeting minutes, November 14, 2025 — Public Utility Commission of Texas. The commission adopted a final order in that docket.
Future Walton County documents
These documents do not exist yet
A scope of work for a feasibility study, a note from CHELCO or FPL, or a public meeting record could be linked here if one is created. This box is a placeholder. It is not a current record, and it is not a promise that those documents will be written.
Information and sources last reviewed September 2026.